7 | Bangladesh | | Urban high | Emptying and Transport | FSM | Road Manual | Secondary | | 2018-02-01 | Rahman et al. | | | Manual and transport to nearby drain or low lying area | Fee | 4000 | 0 | 5000 | 4500 | event | BGD | 2015 | 159.83 | assume HH empty every 5 years, divide by 5 and double to include transport to treatment site | 0 | 63.93 |